April 2026 CBLE · Category VI: Valuation, Appraisement and Duty Assessment · Question 70 of 80

April 2026 CBLE, question 70

Which of the following is considered an assist and should be included in the entered value?

  1. The cost of engineering plans produced in Omaha, Nebraska for switch assemblies that are supplied free of charge by a U.S. importer to a foreign producer of switches in Taipei, Taiwan.
  2. The cost of printed circuit assemblies that will be integrated into timing switches that are purchased by a foreign producer of switch assemblies produced in Taipei, Taiwan.
  3. The cost of a factory air conditioning system that was supplied free of charge by a U.S. importer to a foreign producer of switches in Taipei, Taiwan.
  4. The cost of printed circuit assembly components for switch integration that are supplied free of charge by a U.S. importer to a foreign producer of switches in Taipei, Taiwan.
Show the official answer

Official answer: D: The cost of printed circuit assembly components for switch integration that are supplied free of charge by a U.S. importer to a foreign producer of switches in Taipei, Taiwan.

Citation in CBP's key: 19 CFR 152.102(a)

Free practice

Answer it under exam conditions

Try 5 random questions with the answer after each one, or sit all 80 on the 4.5-hour clock and get your score by category.

See all 80 answers on one page